<aside> <img src="/icons/info-alternate_blue.svg" alt="/icons/info-alternate_blue.svg" width="40px" /> This document outlines key operational procedures. All employees must follow these standardized processes to ensure consistency and quality.
</aside>
graph TD
A[Code Review] --> B[Testing Environment]
B --> C{Tests Pass?}
C -->|Yes| D[Deploy to Staging]
C -->|No| A
D --> E[Production Deploy]
E --> F[Post-Deploy Checks]
Pre-Deployment Checklist
| Phase | Responsible Team | Documentation Required |
|---|---|---|
| Requirements Analysis | Project Management | PRD, Technical Specs |
| Design Review | Engineering | Design Documents |
| Implementation | Development | Technical Documentation |
| Testing | QA | Test Reports |
<aside> <img src="/icons/exclamation-mark_yellow.svg" alt="/icons/exclamation-mark_yellow.svg" width="40px" />
Critical Security Measures:
<aside> <img src="/icons/exclamation-mark_pink.svg" alt="/icons/exclamation-mark_pink.svg" width="40px" />
Response Levels:
Testing Requirements
<aside> <img src="/icons/exclamation-mark_yellow.svg" alt="/icons/exclamation-mark_yellow.svg" width="40px" />
All deviations from these SOPs must be documented and approved by relevant department heads.
</aside>
Required Documentation Format:
1. Purpose
2. Scope
3. Responsibilities
4. Procedure Steps
5. Quality Controls
6. References
7. Revision History
| Requirement | Frequency | Responsible Party |
|---|---|---|
| Security Audit | Quarterly | Security Team |
| Code Review | Each Release | Senior Engineers |
| Performance Testing | Monthly | QA Team |
| Backup Verification | Weekly | IT Operations |
<aside> <img src="/icons/info-alternate_blue.svg" alt="/icons/info-alternate_blue.svg" width="40px" />
Remember